top of page

Brookside Nursery

Swallowfield, Reading, UK

Brookside Nursery is a functional commercial and industrial site situated on Church Road in Swallowfield, Berkshire. The Brookside provides a varied working environment of commercial units, workshops and service businesses, offering an authentic contemporary backdrop for productions requiring an industrial, trade or business setting. Backing on to a wild flower meadow which houses a pond and bee hives. The space also offers a unique outdoor Mediterranean-style dining environment. Its practical character and location within the wider Swallowfield area make it suitable for commercials, documentaries, corporate productions, contemporary drama and photography.



Quick Facts

  • Commercial and industrial business park

  • Located in Swallowfield, Berkshire

  • Gated 24hr secured site

  • Working business environment

  • Range of commercial units

  • Workshops and trade premises

  • Service and industrial surroundings

  • Vehicle-accessible location

  • Suitable for contemporary productions

  • Industrial / commercial exteriors

  • Business units

  • Workshop environments

  • Trade and service premises

  • Loading and service areas

  • Hardstanding areas

  • Vehicle access

  • Industrial-style architecture

  • Functional working environment

  • Contemporary village-edge setting

  • Commercials

  • Corporate filming

  • Documentary filming

  • Contemporary drama

  • Filming subject to individual business and site-owner approval

  • Working businesses may need to continue operating during filming

  • Access to individual units subject to occupier agreement

  • Production vehicles, equipment and parking arrangements to be agreed in advance

  • Noise, lighting and equipment use subject to site requirements

  • Filming may need to be scheduled around normal business operations

  • Accessible from the local road network

  • Multiple commercial units within the wider business park

  • Vehicle access available, subject to individual unit

  • Parking and loading arrangements vary by unit

  • Mains power availability to be confirmed per unit

  • Mobile signal to be assessed during r ecce

  • Sound conditions should be assessed on location

  • Crew holding and unit-base arrangements to be agreed in advance

  • Flood-risk considerations should be assessed for productions requiring extensive external operations


bottom of page